Andover Controls Energy Link 2000 Installation Guide
File Preview
Click below to download for free
Click below to download for free
File Data
Name | andover-controls-energy-link-2000-installation-guide-1360279845.pdf |
---|---|
Type | |
Size | 1.02 MB |
Downloads |
Text Preview
Controlling Tomorrow World 2000 Guide Version Controls Corporation Manuals Online A or distribution forbidden cid 211 1992 by Andover Controls to change without notice No 30 3001 179 1992 cid 211 Controls Corporation Brickstone Square Massachusetts 01810 Rights Reserved NOTICE by the Engineering Department at Andover Controls Corporation product is subject to change without notice This document does not con any warranty express or implied Andover Controls Corporation re the right to alter capabilities performance and presentation of this at any time 2000 Installation Guide Manuals Online EnergyLink 2000 Installation Guide presents instructions for the EnergyLink 2000 2100 and 2101 on EnergyNet It first how to prepare the site including facts about proper ground then how to install the various EnergyLinks basic information on local area networks LANs refer to the and Infinet Configuration Guide Controls Corporation Manuals Online 2000 Installation Guide Manuals Online the EnergyLink 2000 manual covers installing the EnergyLinks on EnergyNet If you not planned out your network yet read the EnergyNet and Infinet Guide first It contains details on how to select the best for your installation Registration warranty is effective for 18 months starting on the date the is shipped wiring must comply with all local state and national electrical 2000 Installation Guide Manuals Online to Install EnergyLinks EnergyLinks you can have only a bus topology EnergyNet as central active hubs the EnergyLinks let you form star and dis star topology networks addition EnergyLinks allow you to not only extend the maximum length for all buses but also increase the number of controllers al on a single bus You can use EnergyLinks to switch cable types to diagnose network problems The EnergyLink family of links is and diverse you begin you determine the exact kinds of links you require the number of central hubs cable switching links and repeaters If are not sure what you need or how to order it read the EnergyNet Infinet Configuration Guide you can install the EnergyLink 2000 2100 or 2101 you need to some basic information about them the types their modules dimensions and enclosures power requirements grounding re and environmental requirements equipment has been tested and found to comply with the limits for Class A digital device pursuant to Part 15 of the FCC Rules These are designed to provide reasonable protection against harmful when the equipment is operated in a commercial This equipment generates uses and can radiate radio energy and if not installed and used in accordance with the in this manual may cause harmful interference to radio Operation of this equipment in a residential area is to cause harmful interference in which case the user will be to correct the interference at his own expense 2000 Installation Guide Manuals Online Dimensions EnergyLink 2000 is 5.75H a hinged aluminum enclosure that meets UL standards 10.43W 8.66D in The unit is in modules that you ordered with the EnergyLink 2000 can have ports either all coaxial cable or mixed coaxial and fiber optic cable or all optic Each module is approximately 5.25H 7D in 1W with coaxial cable ports have four ports Modules with mixed and fiber optic cable ports have two coaxial and two fiber optic ports EnergyLink 2100 or 2101 is 9.625H in sealed aluminum enclosures that meet UL standards 1.75D The units 6.375W Requirements sure your installation complies with local state and national codes EnergyLink 2000 should receive power from its own independent circuit Other EnergyLinks are attached to a controller or 2000 and do not require their own power source 2000 Installation Guide Manuals Online 1 Electrical Specifications Power Power States V 1 2 A Hz V 1 4 A V 3 A Hz V 1 2 A Hz Size Rating 20 mm Fuse V 1 A slow 20 mm Fuse V 1 2 A slow ship it set to the correct setting with the correct fuse If you want to the setting follow the instructions included in the installation Ground Requirements sure that all products from Andover Controls Corporation is to true earth ground This kind of ground protects the from lightning strikes and other power surges in the area cannot guarantee that the controller system will operate as unless you properly ground all controllers sure to have your grounds inspected before you begin the process to be sure your municipality follows the National 2000 Installation Guide Manuals Online Code Many municipalities do not and often have electrical grounds example of a substandard ground is a galvanized steel cold water As the pipe corrodes it does not act as a true ground The corro acts as an insulator raising the potential of the pipe with respect to ground lightning strikes in the area of the installation it drastically the potential of the earth of much lower potential also impact the reliability of Andover equipment properly grounded Andover Controls units respond to changes in more rapidly than poorly grounded electrical systems a poor grounded building tries to reach ground through the Andover system The surge of current can destroy electronic compo on the controller board the Ground can check your ground as follows Check your ground by first inspecting the building power panel for earth ground termination If the ground is any of the following it is not adequate and must be Does not exist connected to a corroded or galvanized pipe connected using a small gauge wire smaller than 14 AWG If your EnergyLink will not be mounted inside an 9000 controller sure your EnergyLink is connected to the ground with a copper that terminates at the distribution panel 2000 Installation Guide Manuals Online Requirements EnergyLinks operate in rooms with temperatures ranging from 32 140 cid 176 F and with humidity between 10 and 95 non condensing 2000 Installation Guide Manuals Online Coaxial Cables length of coaxial cable connecting to a controller workstation 2000 EnergyLink 2100 or EnergyLink 2101 must have a male connector at both ends If the cables are not already pre you prepare them by attaching the male connectors 1 shows a single piece of prepared coaxial EnergyNet cable piece of coaxial cable from male connector to male connector be at least 6 ft long 1 EnergyNet Coaxial Cable ft minimum Connectors either end of Coaxial Cable end connects to the EnergyLink other to a controller or workstation 2 shows the EnergyNet coaxial T connector Andover Controls 2070 Do not use T connectors on the EnergyLink 2000 ports 2 EnergyNet Coaxial T Connector Cable Cable connects to an EnergyLink 2000 Installation Guide Manuals Online the EnergyLink 2000 careful when unpacking the unit to not damage the packaging must reuse it if you ship the product back for repair Required 1 or 2 EnergyLink 2000s Modules Controls Model No 2001 has 4 coaxial ports No 2002 has 2 coaxial and 2 fiber optic Model No 2003 has fiber optic ports Prepared Coaxial Cables Coaxial Cable BNC Connectors for Coaxial Cable Fiber Optic Cable with ST Connectors Bayonet Style optional the Input Voltage your EnergyLink 2000 is shipped preset