Fire-Lite MS 5210UD MS5210UDE Field Software Change Procedure
File Preview
Click below to download for free
Click below to download for free
File Data
Name | fire-lite-ms-5210ud-ms5210ude-field-software-change-procedure-8106243975.pdf |
---|---|
Type | |
Size | 672.05 KB |
Downloads |
Text Preview
MS 5210UD MS 5210UDE Softw Change Softw Change Software Change Change Softw Softw Change 50479 Rev E 1 20 99 ECN 99 038 procedure outlines the mechanical installation steps required to install a PROM in the MS 5210UD E Change Change Change Change Change circuits circuits integrrrrrated circuits integ integ precautions f precautions f circuits precautions for integ circuits integ precautions f precautions f electricity can destroy integrated circuits ICs To prevent damage the PROM a wrist strap and a static free PLCC IC insertion extraction is highly recommended The manufacturer cannot be responsible for to the PROM as a result of improper handling Sources Sources Pooooowwwwwer Sources P P Sources Sources P P remove primary and secondary power before on the system Disconnect battery backup power before working on the Proceed by disconnecting AC power to the panel at the service circuit breaker not the circuit breaker on fire control panel s power supply TTTTTooloolooloolool IC Extr IC Extr IC Extraction IC Extr IC Extr Wait 60 seconds to allow for capacitive discharge before touching any of the system s Reverse the procedure for powering up the system AC first then batteries Circuit Pin Con Circuit Pin Con Circuit Pin Con Circuit Pin Convvvvversionersionersionersionersion Circuit Pin Con proper orientation of any IC removed or installed Note location of Pin 1 with respect to the corner and dot on the body of the IC and the relationship to the flattened corner on the IC socket replacement PROM must be installed in the same manner as the PROM removed Failure to observe orientation will result in destruction of the PROM Corner Corner Corner Corner Corner Pin 1 Pin 1 Pin 1 Pin 1 Pin 1 Corner Corner Corner Corner Corner Pin 1 Pin 1 Pin 1 Pin 1 Pin 1 Replacement Replacement Replacement Replacement Replacement proper orientation of any IC removed or installed To replace the PROM complete the following steps Remove all power AC and battery before proceeding with PROM replacement If necessary disconnect any installed option modules which may inhibit access to PROM Locate U14 in the center right of the MS 5210UD E board refer to the illustration on the following Replace the PROM in U14 using a static free PLCC IC extraction tool as follows Insert hooks of IC extraction tool into the slots of the IC socket refer to illustration below Gently squeeze the handles of the removal tool and pull to lift the existing firmware IC from socket Save the removed firmware IC in the event the replacement IC is damaged during installation Line up the replacement IC so that its polarization corner flattened is aligned with the corner of the socket Insert the replacement IC by gently pushing it into the The IC should be flush with the socket Reconnect any option modules which were removed in Step 2 Reconnect power AC and battery TTTTTooloolooloolool IC Static free Extr IC Static free Extr IC Static free Extraction IC Static free Extr IC Static free Extr Soc Soc Sockkkkketetetetet Soc Soc IC Static free Extr IC Static free Extr TTTTTooloolooloolool IC Static free Extraction IC Static free Extr IC Static free Extr of 4 50479 Rev E ECN 99 038 1 20 99 U14 U14 U14 U14 U14 and and and and TTTTTestingestingestingestingesting and all site specific programming and test the MS 5210UD E after PROM replacement 50479 Rev E ECN 99 038 1 20 99 of 4 Softw Softw Changes Changes Software Changes Changes Softw Softw Changes following Table summarizes the MS 5210UD software changes specifying these changes by Number and Release Number Changes Changes Softw Softw Changes Software Changes Changes Softw Softw following Table summarizes the MS 5210UDE software changes specifying these changes PROM Number and Release Number of 4 50479 Rev E ECN 99 038 1 20 99