Notifier Seismic Certificate of Compliance
File Preview
Click below to download for free
Click below to download for free
File Data
Name | notifier-seismic-certificate-of-compliance-3128976054.pdf |
---|---|
Type | |
Size | 936.79 KB |
Downloads |
Text Preview
CERTIFICATE OF COMPLIANCE DESIGN OF NONSTRUCTURAL COMPONENTS AND SYSTEMS No Revision 3 Date 11 30 2019 Parameters nonstructural products mechanical and or electrical components listed on this certificate are CERTIFIED1 FOR SEISMIC APPLICATIONS accordance with the following building code2 releases 2003 IBC 2006 IBC 2009 IBC 2012 IBC 2015 following model designations options and accessories are included in this certification Reference report number VMA 45894 01 as issued The VMC Group for a complete list of certified models included accessories options and certified installation methods Fire Alarm Control Panels above referenced equipment is APPROVED for seismic application when properly installed3 used as intended and contains a Seismic Label referencing this Certificate of Compliance4 As limited by the tabulated values below grade grade and roof level installations in essential facilities for life safety applications and or of equipment containing hazardous contents are permitted and included in certification with an Equipment Importance Factor assigned as IP 1.5 The equipment is qualified successful seismic shake table testing at nationally recognized University of California Berkley Pacific Earthquake Engineering Research Center under the witness of the ISO Product Certification Agency The VMC Group Rev 7 1 of 3 Seismic Design LevelsCertifiedIBCImportance IP 1.5Soil Classes A ERisk Categories I IVDesign Categories A FSDS g SDS g z h 0.0z h Design51.500 gZPAH gZPAV g1.667 g0.667 g Test DatumAC156ISO 17025 LaboratoryPre Post Shake FunctionalityTri axial 5 Damping SRSAFLEX H gAFLEX V gARIG V Certified Seismic Installation MethodsDirectly to rigid wallfirealarmresources com OF COMPLIANCE DESIGN OF NONSTRUCTURAL COMPONENTS AND SYSTEMS Product Table Number Intelligent Fire Alarm Control Panel Intelligent Fire Alarm Control Panel Intelligent Fire Alarm Control Panel Intelligent Fire Alarm Control Panel Control Annunciator Firefighter Display Voice Command Products Module Charger Power Supply Charger Power Supply Power Supply Power Supply Up Battery Box Equipment Box Up Battery Box control Panel Release Control Panel Command Emergency Command Center Panel Command Firefighter Telephone Panel Command Emergency Command Center Panel LOC Command Remote Paging Unit Command Remote Microphone Warden 198 Point Addressable Fire Alarm Control Panel Warden 50 Point Addressable Fire Alarm Control Panel Fire Alarm Control Panel Fire Alarm Control Panel Fire Alarm Control Panel Fire Alarm Control Panel Remote Power Supply remote Power Supply Revision 3 Date November 30 2016 Date October 18 2016 Date November 30 2019 2 of 3 Series Series Rev 7 OF COMPLIANCE DESIGN OF NONSTRUCTURAL COMPONENTS AND SYSTEMS and Comments All equipment listed herein successfully passed the seismic acceptance criteria for shake testing non structural components and systems set forth in the ICC AC 156 The Test Response Spectrum TRS enveloped the Required Response Spectrum RRS for all units The units cited in this certification were representative sample s of a contingent of models and all remained captive and structurally after the seismic shake simulation The units also remained functionally operational after the simulation testing as functional testing completed by the equipment manufacturer before and after the seismic simulations Although a seismic qualified unit inherently some wind resisting capacity that capacity is undetermined and is excluded from this certification Snow Ice loads have been and thus limit the unit to be installed both indoors covered by an independent protective structure and out of doors exposed to snow ice for ground snow loads no greater than 30 psf for all applications The following building codes are addressed under this certification 2015 referencing ASCE7 10 and ICC AC 156 2012 referencing ASCE7 10 and ICC AC 156 2009 referencing ASCE7 05 and ICC AC 156 2006 referencing ASCE7 05 and ICC AC 156 2003 referencing ASCE7 02 and ICC AC 156 2000 referencing ASCE7 98 and ICC AC 156 Refer to the manufacturer supplied installation drawings for anchor requirements and mounting considerations for seismic applications anchor locations size style and load capacities tension and shear are specified on the installation drawings Mounting details such as anchor brand type embedment depth edge spacing anchor to anchor spacing concrete strength special wall design and attachment to non building structures must be outlined and approved by the Engineer of Record for the project building Structural walls structural floors and housekeeping pads must also be seismically designed and approved by the project or Structural Engineer of Record to withstand the seismic anchor loads as defined on the installation drawings The installing is responsible for observing the installation detailed in the seismic installation drawings and the proper installation of all anchors mounting hardware For this certificate and certification to remain valid this certificate must correspond to the Certification Label found affixed to the by the factory The label ensures the manufacturer built the unit in conformance to the IBC seismic design criteria set forth by the Seismic Qualification Agency The VMC Group and meets the seismic design levels claimed by this certificate Mechanical Electrical and Plumbing connections to the equipment must be flexibly attached as to not transfer load through the connection structural integrity of any conduit cable trays piping ductwork and or flexible connections is the responsibility of others This does not guarantee the equipment will remain compliant to UL or NEMA standards after a seismic event This certificate applies to units manufactured at Honeywell 12 Clintonville Rd Northford CT 06472 This project follows The VMC Group ISO 17065 Scheme for Product Certification of Nonstructural Components Revision 3 Date November 30 2016 Date October 18 2016 Date November 30 2019 Rev 7 3 of 3 P Giuliano PE The VMC Group