Siemens IQ-UK Kit, Installation Instructions

File Preview
File Preview
Click below to download for free

File Data

Name siemens-iq-uk-kit-installation-instructions-0654789231.pdf
Type PDF
Size 608.08 KB
Downloads

Text Preview

Fire Safety Instructions IQ UK KIT UPGRADE THE IN THE FIELD by removing the old and replacing them with the new ones the following steps in order MODEL MXL IQ inserting the new IC be sure that The U cut in the chip is towards the of the board All IC pins are properly aligned with the Inform the building owner and any other authority that the System will be out of service the changeover is occurring Disconnect the standby batteries from the System Disconnect the AC Power from the System Open the MKB 4 to gain access to the SMB 1 2 that the chip IC 110 you just inserted has same mounting characteristics as the old IC which is still in place With the new IC 110 firmly seated in the SMB 1 2 Board repeat Steps 7 and 8 to replace IC 111 Locate IC numbers 110 and 111 on the SMB 1 2 Beginning with SMB 1 2 firmware version 6.00 two chips each have a label attached to the surface of the chip that indicates the IC number the software revision currently installed Note that IC is installed with the U shaped cutout on chip at the bottom of the PC board Using an approved IC extraction tool like that with the CSG 2 kit remove IC 110 Place the new chips in the same locations on the sockets as those that were Replace IC 110 first using IC 111 as a IF THE ICs ARE INSTALLED INCOR SEVERE DAMAGE TO THE SMB 1 2 OCCUR AT POWER UP Put the replacement IC 110 in an approved IC tool like that supplied with the CSG 2 kit gently insert the IC in the socket labeled IC 110 RAM is required in order to operate This additional RAM is provided by IC 113 with the RAM chip P N 161 provided in the upgrade kit Replace IC with the larger RAM chip by repeating steps 7 8 on IC 113 NOTE If SMB 1 2 firmware 6.00 or higher is installed DO NOT to power operate the system unless RAM upgrade is installed Return the old ICs to Product Service Inspect the NEWLY installed ICs to verify that All IC pins are properly seated in the socket The chips are in the right place and positioned Reassemble the System by reversing Steps 1 4 above Please refer to the MXL IQ P N 315 093624 for additional assistance Once the System has completed its initialization routine perform a System checkout to the building owner and the local having jurisdiction Building Technologies Inc Fernwood Road Park New Jersey 07932 315 095107 4 Building Technologies Ltd Kenview Boulevard Ontario L6T 5E4 CN

Related Files