Siemens MBR-2 and MDR-2 MXL MXLV Backbox and Door, Installation Instructions
File Preview
Click below to download for free
Click below to download for free
File Data
Name | siemens-mbr-2-and-mdr-2-mxl-mxlv-backbox-and-door-installation-instructions-2947680513.pdf |
---|---|
Type | |
Size | 650.17 KB |
Downloads |
Text Preview
Installation Instructions MBR 2 and MDR 2 Backbox and Door BACKBOX Model MBR 2 is the backbox for the MXLV Note that the backbox has a lip to permit semi flush mounting in to the usual surface mounting the following when mounting the Mounting height for visual and manual to the MKB 2 Keyboard Weight and size of enclosure Local mounting codes the MBR 2 backbox securely to a dry shock free and vibration free Position the MBR 2 backbox clear of so that the MDR 2 door opens and so that the indicators and controls easily accessible When the backbox is mounted semi be sure that the position of the permits the MDR 2 door to fully open install the MBR 2 backbox to Figure 1 Remove the knockouts in the backbox field wiring is required Hold the empty enclosure against the wall a height that provides easy access 4 1 2 5 0 6 8 6 2 9 1 2 5 1 2 5 1 the Backbox Mark drill points on the wall in the center of two slots on the upper rear of the MBR 2 Drill the two holes and screw in the top bolts a small gap between the wall and top bolt Mount the MBR 2 on the two bolts and then the bottom bolts in the two holes Tighten all bolts securely against the back of the enclosure Industry Inc Technologies Division Park NJ 315 092068 5 Building Technologies Ltd Safety Security Products Kenview Boulevard Ontario 5E4 Canada install the MDR 2 door to Figures 2 and 3 the MDR 2 outer door on the left side the enclosure as shown in Figure 2 Next insert the necessary filler panels in the 2 the Outer Door DOOR Model MDR 2 door is the main outer door the MXLV enclosure The door is supplied filler plates for the two large openings select the appropriate filler plates for the openings follow the information below When visual indication of system LCD LED or printer is install clear panels the MDL 1 behind the appropriate door open Use the hardware supplied When visual indication of the system is not required install plain panels MDB 1s behind the appro door openings Use the hardware 315 092068 5 3 the Filler Plates in MDR 2