Simplex 4120 Installation Instructions

File Preview
File Preview
Click below to download for free

File Data

Name simplex-4120-installation-instructions-1283674950.pdf
Type PDF
Size 840.07 KB
Downloads

Text Preview

Installation Network NETWORK Notify appropriate personnel occupants department or monitoring etc of the installation Be sure that you are thoroughly with these installation before installing 4120 Network and Equipment Required following and equipment are required network inch flat tip Screwdriver 8 inches long inch flat tip Screwdriver 4 inches long Volt Ohmmeter Diagonal Cutting Pliers Wire Strippers 841 731 Field Wiring Diagram PROMAC PROM Programmer PROM Eraser optional 286 or better IBM Compatible Download cables Must contain Version 6.01 or later of the 4100 Programming Unit Computer with Hard Drive and Software Required following hardware and software are required this installation Any of the following 4120 Network components 4120 8001 Fire Alarm Control Panel 4120 8201 Voice Fire Alarm Control Panel 4120 8010 Miniplex Control Panel 4120 8210 Voice Miniplex Control Panel 4120 8511 Universal Transponder 4120 8601 Voice UT 4120 8602 UT Status Command Center Voice Modules optional 4120 8801 2500 Point Network Display Unit 2500 NDU 4120 8821 2500 NDU with Command Center Job Disks Required Material following material also required 4120 Network Programmer Report for each node Single page operating sheet for each node to be mounted on the wall near the panel 1992 Simplex Recorder Co Gardner MA 01441 0001 specifications other were current as of oublication are subject change without notice 574 309 12 92 Network documentation 4120 Network Installation 4120 Programming Unit Programming NET 21 004 4120 Network NET 41 003 Preparation the site for the network the following manner Use the Packing Lists to verify the availability of all required 4120 Network hardware Make certain that each node of the 4120 Network is installed per applicable Verify the stand alone operation of each node using the Programmer Report for that node Make certain that all network cabling Verify the network wiring throughout installed cable run that node a Node to the 4120 Network the following procedure connect a node to the 4120 Network Unlock and open the panel door Remove the retainer the following manner Remove retainer holding screws Squeeze and pull the two black plastic tabs located on the upper part of the retainer Lift the retainer from the back box Disconnect batteries and remove AC power to the unit Connect network wiring to U T Universal Motherboard Terminals TBl and TB2 Refer to the 841 731 Field Wiring Diagram the 4120 4100 Network Board into the right hand socket on the U T Universal Motherboard Configure Network Board Address Switch SW1 in accordance with the assignment that card Power up unit and connect batteries the Network all of the nodes have been connected Test point status changes Test common annunciation Test common network about point and node information point status reports and responses the network use the Network Programmer Reports to verify the Version 6.01 or later of the 4100 Programming Unit to make any corrections NET 41 003 for programming the node CFIG chips Refer to the network responses are satisfactory perform the following steps for each node Replace the retainer and the retainer holding screws Close and lock the panel door Notify appropriate personnel occupants department or monitoring etc of the installation Be sure that you are thoroughly with these installation before installing 4120 Network and Equipment Required following and equipment are required network inch flat tip Screwdriver 8 inches long inch flat tip Screwdriver 4 inches long Volt Ohmmeter Diagonal Cutting Pliers Wire Strippers 841 731 Field Wiring Diagram PROMAC PROM Programmer PROM Eraser 286 or better IBM Compatible Download cables and Software Required Must contain Version 6.01 or later of the 4100 Programming Unit Computer with Hard Drive following hardware and software are required for this installation Network card for each node 4120 4100 Network Board Motherboard each node B Network Board Motherboard Firmware chips for each node System Executive chip s Spare 32K RAM chips Spare CFIG Flash EPROM chips Spare CFIG PROM chips for standard 4100 node if required Job Disks compatible with the 4120 0140 Network Board are 4100 8001 Fire Alarm Control Panel 4100 8201 Voice Fire Alarm Control Panel 4100 8010 Miniplex Control Panel 4100 8210 Voice Miniplex Control Panel 4100 8511 Universal Transponder 4100 8601 Voice Universal Transponder 4100 8602 UT Voice Status Command Center If your 4100 Fire Alarm Panel is at Software Version 4.02 or earlier it can only be connected the 4120 by upgrading Master Controller one of two ways a 4100 7050 Master Controller Upgrade Kit or Reprogramming Master Controller with a 4100 0150 After Market Reprogram sheet for each node to be mounted on the wall near the panel Required Material following material also required for network installation Programmer Report for each node Single page operating Network documentation 4120 Network Installation 4120 Programming Unit Programming NET 21 004 4120 Network NET 41 003 Preparation the site for the network the following manner to verify the availability of all required network hardware Use the packing Make certain that all network cabling Verify the network wiring throughout installed cable run a Node to the Network the following procedure connect a node to the network Unlock and open the panel door Remove the retainer the following manner Remove the retainer holding screws Squeeze and pull the two black plastic tabs located on the upper part of the retainer Lift the retainer from the back box batteries and remove AC power to the unit the B Network Board Motherboard the first available panel location network wiring to network motherboard TBl and TB2 Disconnect Connect Refer to the 841 731 Field Wiring Diagram Install the 4120 4100 Network Configure that card Remove the current System Executive Chip s and CFIG Chip from the Master Controller board and install the Board Address Switch SW1 in accordance with the assignment Board in the socket on the network motherboard Network System Executive Chip s and CFIG Chip If the node Master Controller uses a CFIG Flash EPROM you may perform a direct download the CFIG EPROM without removing from the Master Controller Power up unit and connect batteries the Network all of the nodes have been connected Test point status changes Test common annunciation Interrogate Test common network about point and node information point status reports and responses the network verify the network using the Network Programmer

Related Files