Edwards 51XBRF Series Flashing LED Signal Installation Sheet
File Preview
Click below to download for free
Click below to download for free
File Data
Name | edwards-51xbrf-series-flashing-led-signal-installation-sheet-8794605321.pdf |
---|---|
Type | |
Size | 670.67 KB |
Downloads |
Text Preview
Series Flashing LED Signal Sheet this unit in accordance with the latest edition of the 70 National Electrical Code and local codes Prior to the signal base the signal must be removed from the The base can be mounted using one of the following Direct surface mount Mounted on 1 2 in NPT conduit Mounted on a 4 in octagon box prevent electrical shock ensure that power is before installing the signals prevent leakage and potential electrical shock use when disassembling the signal to prevent tearing of permanently affixed gaskets provided for remove the signal from the base Remove the screw in the clamp ring and then remove the See Figure 1 Carefully lift the lens lamp assembly off the base the signal base using one of the following mounting 1 51XBRF series flashing light with horn 51XBRF Series Flashing LED Signals are AC and DC combination flashing LEDs with horns They feature designed polycarbonate lenses These signals are for installation in a permanent outdoor or indoor Their base allows direct surface mounting on 1 2 in NPT conduit or mounting on a 4 in mm octagon box A hardware kit is included with the for direct surface mounting applications horns flasher modules and lenses are available the signals Refer to the table at the end of these for details compatibility electrical input load requirements for PLC compatible devices are listed in Table 1 Signaling devices may directly connected to output cards that meet the input load 1 PLC compatibility number voltage state leakage current on current inrush duration 51XBRF 24D VAC mA max mA A 260 VDC mA max mA A 120 letter in this position signifies lens and LED color A amber B W white G green or R red 2012 UTC Fire Security All rights reserved 4 3101648 REV 1.0 ISS 03JAN12 direct surface mount the base Remove the two knockouts for mounting screws from the base bottom See Figure 1 for the location of the Place the mounting gasket provided in the hardware kit on mounting surface and mark the center of the three in the gasket onto the mounting surface Remove gasket and then drill a 3 8 in 9.5 mm hole at each of marked positions See Figure 2 the two rubber expansion plugs provided in the kit into the two outer holes in the mounting as shown in Figure 2 Route the field wiring from the required power source for signal refer to its label for the voltage rating through center holes in the mounting surface mounting gasket signal base Align the holes in the mounting gasket with the holes in signal base Insert the two screws with lock washers in the hardware kit through the mounting holes the base and align the screws with the rubber plugs as shown in Figure 2 Press the base firmly against the mounting surface and the screws 2 Direct surface mounting mount on a 4 in 102 mm octagon box indoor only Remove the two knockouts for mounting screws from the base bottom See Figure 1 for the location of the Route the field wiring from the required power source for signal refer to its label for the voltage rating through center hole in the base Fasten the base to the octagon box not supplied by the screws supplied with the box through the in the base Proceed to below for wiring connections wire 24 VDC models Using wire nuts not supplied connect the signal s red to the positive power source lead and connect the wire lead to the negative power source wire Neatly place the connected wires inside the base and carefully position the lens lamp assembly onto the wire 120 VAC models Using wire nuts not supplied connect the signal s black to hot power source lead and connect the white wire to the neutral power source wire Connect the green wire to the earth ground connection Neatly place the connected wires inside the base and carefully position the lens lamp assembly onto the Turn on the power and then verify that the signal operates Proceed to below for wiring connections Turn on the power and then verify that the signal operates For direct surface mounting the 51XBRF series signals be installed in any position To prevent leakage and a potential shock hazard mounting outdoors the signal must be installed with the or dome facing directly up mount on in NPT conduit Route the field wiring from the required power source for signal refer to its label for the voltage rating through a in NPT conduit not supplied and through the center in the signal base the base on the conduit Proceed to below for wiring connections 4 3101648 REV 1.0 ISS 03JAN12 number specs VAC 0.175 A VAC 0.175 A VAC 0.175 A VAC 0.175 A VAC 0.175 A VDC 0.275 A VDC 0.275 A VDC 0.275 A VDC 0.275 A VDC 0.275 A information A Division of UTC Fire Security Corporation Inc Town Center Parkway Bradenton FL USA 1638 information contact information see our Web site prevent electrical shock ensure that power is before installing the signal prevent leakage and potential electrical shock use when disassembling the signal to prevent tearing of permanently affixed gaskets provided for replacement to Table 2 for the required horn After disconnecting remove the old horn and attach the new one Reattach horn module wiring to the flasher module wiring To prevent damage to the lens do not use abrasive or cleaners signal lens should be cleaned periodically to maintain light visibility It can be cleaned with a soft cloth or using mild detergent Dry the lens completely before it American 2 Replacement parts Number horn lens state flasher module P 041917 0026 in this position designates lens and LED color A amber B W white G green R red the LED is flashing and the horn is not buzzing then the solid flasher needs to be replaced If after the replacement of state flasher the horn is still not buzzing then the horn to be replaced If the LED is not flashing and the horn is then the LED circuit is damaged the LED circuit is not as replacement part 3101648 REV 1.0 ISS 03JAN12 4 4 3101648 REV 1.0 ISS 03JAN12