Hochiki FNV Voice Evac Instructions Engineer Specification FNV Voice Evac system shall include one Master Panel and one or more Distributed The system shall be microprocessor based and shall be compatible for use with data transmission or contact closures from the Fire Alarm Control Panel FACP The shall have a high speed communication bus and have the capacity for 6 channels of audio and data on a single pair of wires The field wiring for the communication may be configured for either Style 4 or Style 7 supervision The system shall have the for Fire Fighters Phone communication The system shall have a minimum capacity 2048 monitor and control points Master Panel shall contain an integral microphone dual channel digital message DMR and digital tone generator 120 VAC power supply and battery charger The shall be modular in design and shall be expandable such that additional system points may be configured The system shall include integral self diagnostic routines shall continually monitor system status and shall indicate the precise type of trouble should they occur in the system A trouble condition within the system shall cause trouble indication to be transmitted to the FACP panels shall provide a minimum of 4 Class B Style Y speaker circuits to eight total Alternately panel may be configured for 4 Class A Style Z circuits Panel will provide up to 6 simultaneous audio channels up to 16 Fire circuits Amplifiers will contain their own power supplies battery chargers and provide power for other components Speaker circuits shall be supervised for short and open conditions and shall be able to withstand transient or continuous short circuit without damage to the system may be configured for General Alarm All Call operation Alarm by Zone or Above Floor Below as required Serial data transmission or Fire Routing Contact shall allow immediate broadcast of an alarm signal and evacuation message to the area Non Alarm areas may receive alert tones and messages as required or by the FACP alarm signal evacuation message shall be broadcast until the FACP is Silenced or reset until emergency personnel interrupt the broadcast with a manual page prevent unauthorized tampering the voice evacuation system shall disable the if the microphone is keyed continuously for 3 minutes or more Systems that do have this feature shall not be acceptable FNV 5010 REV D 1 of 12 read this Manual completely before installing the FNV System must insure that all wiring and devices installed in system meet the following standards National Electrical Code NFPA 70 NFPA Standard 72 Life Safety Code NFPA 101 equipment in a clean dry environment avoid installation where equipment could be subjected to Make sure all Non Power Limited cabling is separated from Power Limited cabling Refer to wiring and terminal designation diagrams PANEL Connect Netcom Bus between all panels Maximum distance between panels is 4000 min 16 AWG 120 Ohms max Impedance See page 5 for wire type 18 GA UTP Is recommended Connect AC power to master panel and then connect batteries Once power is on to the unit connect battery wiring harness from the PWR power supply board TB Red Black Observe polarity Minimum battery size is 7AHr Max 24 Ahr in a separate cabinet use 2 12V batteries connected in series See Master panel wiring diagram on page Wiring for batteries and 120 VAC is Non Power Limited Care must be taken to insure that all wiring maintain a minimum spacing of from any Non Power Limited wiring If must be located in separate enclosure provide separate conduit run for battery wiring only PANELS number of Distributed Panels is 250 on a system circuits require an End of Line resistor for supervision Attach a value EOLR for speaker circuits to TB9 1 2 on MBR board This value must be placed at the end of the speaker as well The system is shipped from the factory with 10k Ohm watt EOLR Connect all speaker loops UL listed devices to TB1 TB4 along the top edge of the MBR mother in the Distributed panels Fire Phone circuit connects to TB5 TB6 on the left side of the MBR in the Distributed panels Refer to page 7 Connect 120 VAC 60 Hz power to the black and white pigtail leads from transformer primary For systems attach power to both of the Black leads Secure ground lead to grounding stud in located on the backplate a Reset This is done by holding the Fault Once all power and circuits are connected switch in the up position while the Reset switch is clicked twice This will rerun the Green LED will remain on to indicate that the FNV system is On Diagnostics program T operational and all circuits are nominal Observe the display during the reset it will show how DP panels are connected to the loop MAINTENANCE battery life is approximately 3 5 years depending on usage Always replace both with same amp hour ratings and of approximately the same age Refer to the battery specifications for the particular battery used FNV 5010 REV D 2 of 12 Operation ALL panels in system are pre programmed at the factory When the Fire Routing input on the FNV IOI FACP Interface card is triggered with Alarm 12 or 24VDC in conjunction with Serial Data transmission from the FireNet FACP the Signal and Message will be broadcast into the selected Evacuation Zone If has been enabled the Evacuation Zone for the floor above and the floor the selected zone s will also be activated floor s receiving the Alarm Tone Message is displayed by a slow 2 second flashing of the associated with the Evacuation Zone on the Paging Control panel Alert Non Fire Floors has been enabled in programming all floors not broadcasting the Signal and Message will begin broadcasting the Alert Signal and Message addition if the paging microphone is used and no Evacuation Paging Zones have been selected paging will automatically be routed to those zones that are in alarm The Signal will resume when paging is ended as will the Evacuation Message an Evacuation Paging Zone is selected manually paging will take place in the selected zone or only operation if system was designed as channel a single Distributed Panel and due to the nature of Dual Channel systems using one per channel paging into an Evacuation Paging Zone broadcasting the Alert Signal and will silence the other zones also broadcasting the Alert Signal and Message if there is a zone broadcasting the Alarm Signal and Message In other words within a single panel only two audible signals can be broadcast at one time either Alarm and Alert Alarm Signal and Paging or Alert Signal and Paging When an Evacuation Paging Zone is selected by the operator using the associated on the Paging Control panel the LED s will indicate which zone s have been selected All Call switch on the FNV Control panel will select all zones for paging when clicked once A click of the All Call switch will deselect all zones Zone Selection switches indicate which zones have been selected for paging Broadcast of voice messages does not take place until the Push to Talk switch on the microphone is Phone When a Fire Phone Handset is plugged into a Fire Phone Jack the LED on the Zone panel associated with that Fire Phone zone will start flashing A ringing signal will be to indicate that a handset has been jacked in The ringing signal will cease when the Fire Zone is selected only one Fire Phone Zone is selected at a time Selecting another zone where a FNV 5010 REV D 3 of 12 Control Panel Refer to Master Panel Controls and Display diagram Page 6 The Control Panel status indicators are and On Diagnostics the system is scanned for active Distributed Panels and The Message Display indicates how many Distributed Panels have been found and event buffers are cleared indicator is on as long as there is power available to the FNV Master Panel indicator will be on whenever an Evacuation Signal or Alert Signal is active indicator will be on blinking whenever a fault has occurred in the FNV system The display will indicate a code for the fault that has occurred In addition the audible fault will be active beep tone as long as the fault persists The Silence switch can be used silence the audible fault indication but the visual indicator can only be cleared by an FNV Reset If the fault is cleared manually the yellow led indicator can be cleared with a single

Related Files