Siemens DB-X11RS Detector Base, Installation Instructions

File Preview
File Preview
Click below to download for free

File Data

Name siemens-db-x11rs-detector-base-installation-instructions-0396587124.pdf
Type PDF
Size 661.93 KB
Downloads

Text Preview

Installation Instructions DB X11RS Base BASE RELAY BASE DB X11RS NEXT DEVICE NOT USE AN OF LINE NEXT DEVICE NOT USE AN OF LINE INITIATING CIRCUIT SIEMENS INC PANEL 120 VAC 30 VDC RELAY CONTACTS ARE SHOWN IN THE NON ALARM SYSTEM RESET CONDITION 1 Diagram for DB X11RS using FPT 11 FS DP FS DPT and FS DT Detectors AND BASE PLACEMENT and base locations shall follow the drawings provided or approved Siemens Industry Inc or its authorized distributors This is extremely The detector placements shown on these drawings were cho after a careful evaluation of all facets of the protected area When are not available refer to Detector Placement section of detector Instructions and to NFPA 72 National Fire Alarm Code 5 and CAN ULC S524 WIRING should be interconnected as shown in Figure 1 and wired to control panel following the wiring connection drawing installed on the face of each control panel cover Duplicate wiring information is in the Installation Operation and Maintenance Manual provided every control panel Note any limitations on the number of and restrictions on the use of remote devices permitted each circuit Industry Inc Technologies Division Park NJ 315 096040 4 Building Technologies Ltd Safety Security Products Kenview Boulevard Ontario 5E4 Canada MOUNTING USING THE DB X11RS BASE detector is provided with a separate base which attaches to a 4 inch square or a 4 inch octagonal electrical box with the box and depth required by the NEC for the number and size of conduc used Wire size max 14 AWG min 18 AWG to Figure 2 Route all wires outward from outlet box When the ALARM LED viewing is critical position the LED mark in base in the intended direction Route wires through the hole in the center of the base and mount to outlet box Make connections directly to the base terminals to Figures 1 and 2 for details After all bases are installed check wiring integrity To insure proper installation of the detector head into the base Route wires away from connector terminals Take up all slack in the outlet box Properly dress and position all wires flat against the base Check that screw terminals are tight I N LED WITH BASE 2 the Base 315 096040 4

Related Files